| Overall storage level |
Weekly storage change |
This time last year |
Weekly rainfall |
Weekly consumption |
||||||||
| 90.4% | +1.6% | 78.4% | 28.8 mm | 5.2 ML |
| Location | Total capacity (ML) |
Present volume (ML) |
Same time last year (ML) |
Weekly variation (ML) |
% full |
|---|---|---|---|---|---|
| Marengo Basin | 125 | 113 | 98 | +2 | 90.4 |
All material on this site Copyright © 2012 Barwon Region Water Corporation
Head Office: 61-67 Ryrie Street, Geelong, 3220, Victoria, Australia.
Ph: 1300 656 007
E-mail general enquiries: info@barwonwater.vic.gov.au